Worpackage leader

Stuart Clayman (UCL)

Objectives

  • O3.1 Transform the requirements from the use cases of WP2 into a system architecture, defining all the relevant components and functions.
  • O3.2 To design the platform architecture, as well as its validation and transition approach.

Tasks

  • Task 3.1: System Architecture – M1- M24 (lead: UNICAMP, deputy: UOM)
  • Task 3.2: Platform Architecture – M6-M24 (lead: UCL, deputy: UFRN)

Deliverables

  • D3.1: NECOS System Architecture and Platform Specifications V1 – (M9)
  • D3.2: NECOS System Architecture and Platform Specification V2 – (M18)

Milestones

  • M3.1 – Architecture and Platform Specification V1 – M9
  • M3.2 – Architecture and Platform Specification V2 – M18
Back